Daily Site Reports

Monitor daily progress, weather logs, and material consumption.

42
Total Submitted
68%
Cumulative Progress
2 hari
Rainy Days Logged
352 sak
Cement Consumed
Sunday, Aug 2, 2026
AMPM
Physical Progress80%

Pengecoran struktur kolom beton BSD Office lantai 2 selesai 80%. Pengiriman besi tulangan 1.5 ton sudah diverifikasi.

Work Activities

  • Pengecoran Kolom Lantai 2
  • Pemasangan Begesting Besi

Materials Consumed

Semen Portland
45 sak
Pasir Beton
4.5 m³
Besi Tulangan 12mm
150 batang
Reporter: Candra Wijaya
Saturday, Aug 1, 2026
AMPM
Physical Progress100%

Pekerjaan galian pondasi selesai 100%. Dilanjutkan perataan tanah dasar dan penaburan pasir urug setebal 10cm.

Work Activities

  • Galian Tanah Pondasi Tapak
  • Pemasangan Pasir Urug Tebal 10cm

Materials Consumed

Pasir Urug
12 m³
Air Bersih
2 tangki
Reporter: Candra Wijaya